1976 Hell's Gate
completed
columns
beers in the bunks
curved
top filled
looking down a caisson
backfilling after the last
pour
crew heading in for coffee
Uncle Speeder and his dog
the best pic
top precast
train and inside footing
train rollin thru
more trains
engine going thru at dusk
I forgot my googles
view looking up at the trams
Frank and Leroy
forming the wall behind
Shine and Terry
Uncle Brian
the batch plant
heading for lunch
Billy slashing sacks
Terry and Bruce drilling for dowels
Bruce and Shine
Frank Walker
Grandma Ljunggren
Speeders dog (I'm still using that gas dryer in the background)
bunkhouse crew
Norm Ralkie, Bill Harrison and
Bedrock Bill
Shine and Terry
Shine and I
hoisting a rock out of caisson #5
Leroy and Terry
Terry and Bedrock Bill
Terry and Bedrock Bill #2
Shine after a blast at Pt. Simpson
Terry
moving our pre-cast beams
Mike, Bedrock and Shine
Me
loading the redi-mix truck
backfilling the 1st beam
hauling pre-cast beams with the
Balmar loader
me watching the crane
Mary
Hoisting the Prowler
getting everything ready to load
on flatcars
off-loading the ATCO bunkhouse
Mr. Lemoine
looking down a caisson
Leroy spit that hot pepper out
pretty fast after the pic
Jimmy, me, our Inspector, Bruce
and Bedrock
offloading a beam
Frank Walker at the batch plant
Bruce
Fond memories of some fantastic friends way back in 76